Longshine LCS-KL-2716M User Manual Page 18

  • Download
  • Add to my manuals
  • Print
  • Page
    / 38
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 17
17
To Install cascade chain, please follow the instruction below:
A. Please turn off computers and devices when you start to install KVM
Switch.
B. Use the custom combo cable set (See
Figure 6
), to connect one or more
Slave KVM Switches to any PC port of Master KVM Switch. The
connection between KVM to KVM must be connected through PS/2
connection. ( Please refer to
Figure 7 & Figure 8
).
C. You can do console Master KVM Switch via either USB and/or PS/2
keyboard and mouse at will.
D. Plug in the power adapter of the first level Master KVM Switch and
connect Master KVM switch to computers.
E. Next, plug in power adapter for each level Slave KVM Switch and connect
Slave KVM switch to computers .
F. The power on sequence should be:
1. Master KVM Switch
2. Second level Slave KVM Switch (connecting to Master KVM Switch) if
any.
3. Third level Slave KVM Switch (connecting to second level Slave KVM
Switch) if any.
4. All computers connecting to Master/Slave KVM Switch.
G. After all KVM Switches are powerd by power adaptor, trun on the
computers.
Initial Plug-in Process:
Please plug in the Master KVM Switch first before turning on any
other devices like montior or computers.
Hot plug and Hot Swap:
Combo Free 8-port & 16-port KVM switch support Hot plug and Hot swap
function.
Page view 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 37 38

Comments to this Manuals

No comments